Skip links

Construction Information

Anticipated Dates: 4/10/2019 – 5/15/2020

Where to go during construction:

We are excited for our new Inpatient Unit expansion project to get started.  Please bare with us as we make some temporary changes to our parking, entrances, and facility navigation during this phase. While parking close to our front entrance will be limited,  our front door patient drop-off and pick-up area remains available. Please refer to the maps below.

Download Construction Maps (PDF)

Cardiac Rehab, Cancer Center, or lower level Conference Rooms

*Click on maps to make larger. They will open in a new window.

Main Level

Follow route from Hospital main entrance to elevator and take to lower level

Lower Level

At elevator, follow route to Cancer Center, Cardiac Rehab, or Conference Rooms

Parking

*Click on maps to make larger. They will open in a new window.

Use these maps to locate onsite parking options at Hutchinson Health and adjacent parking at Plaza 15 during construction.

Download and Print:

Download Construction Maps (PDF)
FacebookTwitterEmailPrintFriendly